Monday, 7 January 2013

One system and Two system upgrade in EM 12c


One System Upgrade:

  •           This approach is simpler.
  •           This approach assumes the same host as the prior version of operation.
  •           The repository components are upgraded in the same repository database.
  •           This approach is suitable, when the number of agents is less.
  •           Requires downtime.
  •           OMA , OMS and Repository database are upgraded at once.



Two System Upgrade:

  •  This approach is useful in more complex monitoring environments, where:
  •   A different host from the prior OMS version of operation will be used.
  •  The repository components will be upgraded in a different repository database copy.
  •  Best suited for large agent counts and anywhere the unmonitored time must be minimized.
  •   Minimal Downtime
  •   The existing reports, metrics and jobs are migrated as well.

No comments:

Post a Comment